Unidad No. |
La dimensión (mm) |
El cojinete No. |
La vivienda No. |
Peso(kg) |
|||||||||
D | H | Un | E | B | S | G | W | B | N | ||||
La UCP201 | 12 | 30.2 | 127 | 96 | 38 | 19 | 15 | 62 | 31 | 12.7 | UC201 | P201 | 0.63 |
La UCP202 | 15 | 30.2 | 127 | 96 | 38 | 19 | 15 | 62 | 31 | 12.7 | UC202 | P202 | 0.61 |
La UCP203 | 17 | 30.2 | 127 | 96 | 38 | 19 | 15 | 62 | 31 | 12.7 | UC203 | P203 | 0.59 |
La UCP204 | 20 | 33.3 | 127 | 96 | 38 | 19 | 15 | 65 | 31 | 12.7 | UC204 | P204 | 0.61 |
La UCP205 | 25 | 36.5 | 140 | 105 | 38 | 19 | 16 | 70 | 34 | 14.3 | UC205 | P205 | 0.74 |
La UCP206 | 30 | 42.9 | 165 | 121 | 48 | 21 | 18 | 83 | 38.1 | 15.9 | UC206 | P206 | 1.15 |
La UCP207 | 35 | 47.6 | 167 | 126 | 48 | 21 | 19 | 92 | 42.9 | 17.5 | UC207 | P207 | 1.4 |
La UCP208 | 40 | 49.2 | 184 | 136 | 54 | 21 | 19 | 98 | 49.2 | 19 | UC208 | P208 | 1.78 |
La UCP209 | 45 | 54 | 190 | 146 | 54 | 21 | 20 | 106 | 49.2 | 19 | UC209 | P209 | 2 |
La UCP210 | 50 | 57.2 | 206 | 159 | 60 | 25 | 22 | 112 | 51.6 | 19 | UC210 | P210 | 2.55 |
La UCP211 | 55 | 63.5 | 219 | 171 | 60 | 25 | 22 | 126 | 55.6 | 22.2 | UC211 | P211 | 3.2. |
La UCP212 | 60 | 69.8 | 241 | 184 | 70 | 25 | 25 | 137 | 65.1 | 25.4 | UC212 | P212 | 4.4. |
La UCP213 | 65 | 76.2 | 265 | 203 | 70 | 29 | 27 | 150 | 65.1 | 25.4 | UC213 | P213 | 5.1. |
La UCP214 | 70 | 79.4 | 266 | 210 | 72 | 31 | 27 | 156 | 74.6 | 30.2 | UC214 | P214 | 5.7 |
La UCP215. | 75 | 82.6 | 275 | 217 | 74 | 31 | 28 | 163 | 77.8 | 33.3 | UC215. | P215. | 6.3 |
La UCP216 | 80 | 88.9 | 292 | 232 | 78 | 31 | 30 | 175 | 82.6 | 33.3 | UC216 | P216 | 7.6 |
La UCP217 | 85 | 95.2 | 310 | 247 | 83 | 31 | 32 | 187 | 85.7 | 34.1 | UC217 | P217 | 9.2 |
La UCP218 | 90 | 101.6 | 327 | 262 | 88 | 33 | 34 | 200 | 96 | El 39, 7 | UC218 | P218 | 11.4 |
Aplicación
1. Control automático de la máquina
2. Industria de semiconductores
3. Maquinaria para la industria en general
4. Equipos médicos
5. Equipos de energía solar
6. La máquina-herramienta
7. Sistema de aparcamiento
8. Tren de alta velocidad y la aviación el equipo de transporte, etc...
Embalaje y envíos de la UCP serie
Detalle de embalaje |
1. Paquete exportador Industrial
2. De plástico individual/Caja/Palet 3. Como las necesidades del cliente |
Detalles de la entrega | 30-45 días para el orden normal |
Teléfono: | |
Fax: | |
Dirección: | Zona de la industria Henghe maya de la ciudad, Cixi, Ningbo, China |